top structure meaning in Chinese
炉顶装置
Examples
- As a kind of new topping structure of road , colored pavement is arousing peoples interesting and concerning
摘要彩色路面作为1种新型的道路面层结构,正在引起人们广泛的兴趣和关注。 - 2 . by analyzing the enterprise ' s real status and demand , the network top structure and soft system structure are set up for implementation . also , the design target and develop flow of the entire application are provided for next process
2 、分析了企业的现状与需求,确定了系统的硬件网络拓朴结构和软件体系结构及开发环境,并建立了应用系统的设计目标,为整个应用系统的下一步设计提供了开发流程。 - At present , the analysis is only confined to pile basic in much domestic and international software . on the interaction of pile basic and top structure , there are many problems of calculation models and applications , through the domestic and international scholars have done some helpful exploration
目前大多数国内外软件对桩基础的分析仅局限于桩基本身,对于桩基和上部结构的相互作用,虽然国内外的学者做了大量的研究,但还存在许多计算模式和应用上的问题。 - According to the theory of the wind load , the static and dynamic analysis under the along wind load of the main frame and test of comfortable extend are achieved and the static and dynamic analysis of the top structure are carried out according to these foregoing analysis and studies , we have given the mechanic performance of the structure comprehensively and objectively
根据结构抗风理论,实现主体框架结构顺风向静动力风荷载分析和舒适度验算以及顶部多功能厅结构顺风向静动力风荷载计算。同时上述的这些分析,比较全面客观地得出了结构的力学性能,指出了该结构的合理性与可靠性,为实际的结构设计施工提供了理论上的依据与参考。 - As an inlet structure , the forbay is an important part of the pumping station . the pressurized forbay , close in top structure , is a kind of particular forbay in which water is pressurized . based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station , some research on the hydraulic characteristics of the pressurized forbay has been done in the paper . the main content is listed as follows : l . the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure , and the reason of the poor flow state . 2 . the hydraulic characteristics of the pressurized forbay with diversion pier , and the reason why the flow state can be improved . 3 . the experimental research on the critical air suction condition of the pressurized forbay
本文基于上海长桥自来水厂改造工程送水泵站整体水力模型试验,对有压前池的水力特性进行了研究,研究的主要内容如下: 1 、无导流措施的有压前池在不同供水组合及不同机组开机组合条件下的水力特性,并分析了流态较差的原因; 2 、加设导流墩后有压前池的水力特性,以及加设导流墩流态改善的原因; 3 、有压前池进气临界条件的试验研究; 4 、水泵进气以后水泵性能的讨论。